A fishing boat at sunrise on the Bay of Bengal

Indian AI Mission Initiative: green AI compute, starting in West Bengal

The Indian AI Mission Initiative is Cehpoint's promoter-led plan to build affordable, energy-aware AI compute for Indian businesses, starting with a modular data centre in West Bengal. It is not affiliated with or endorsed by the Government of India or the official IndiaAI Mission.

Six parts of the plan, and where each stands

  • Under study

    Sustainable compute campus

    A modular data centre with GPU and CPU compute, storage, backup and security. A 250–500 kW first phase is being studied in West Bengal, with a path to 1 MW and beyond only as contracted demand grows.

  • Concept

    Seaside compute, cooled by the sea

    At a coastal site, seawater can carry heat away through an isolated heat exchanger while a sealed loop of treated water cools the servers, so cooling does not draw on a city's drinking water. It cools; it does not generate power. Subject to coastal (CRZ) and environmental approval.

  • Under study

    Renewable-first energy

    Solar and wind through power purchase agreements, batteries for peaks, and software that moves flexible AI jobs to the hours when the supply is cleanest. The grid stays connected for reliability.

  • Live

    AI and SME cloud

    Private AI, AI agents, APIs and security for small and medium businesses. The AI layer runs today: Cehpoint AI Chat, the Commercial API, AI agents and Agentic AI.

  • Concept

    Privacy-first AI hardware

    A wearable note-taker and an office meeting-memory device with a physical mute switch and a visible recording light. No covert listening, by design.

  • Concept

    Regional compute companies

    A company registered in each region where a compute centre operates, with local partners, local jobs and local accountability.

Data centre seawater cooling

Cooling with the sea, so the city keeps its drinking water.

  1. Seawater is drawn through a screened intake designed to protect marine life.
  2. It is filtered and monitored for sediment, salinity and biological growth.
  3. A corrosion-resistant heat exchanger moves heat from the facility into the seawater; the two never mix.
  4. A separate, sealed loop of treated water carries heat away from the servers.
  5. The seawater is returned with its temperature monitored, under the coastal and environmental permissions.
  6. Independent backup cooling covers storms, intake blockage and maintenance.

Renewable energy powered data centres

Renewable-first, and measured.

Electricity comes from solar and wind through power purchase agreements, with batteries for peaks and the grid kept for reliability. Software moves flexible AI work to the hours when the supply is cleanest.

Efficiency (PUE), water use (WUE) and the renewable share will be measured and published after independent commissioning, with the method stated. Nothing is claimed in advance: no "free" or "unlimited" power, and no exotic energy sources in the base plan.

Indicative roadmap, from the concept paper

How it gets built: in stages, against real demand.

  1. 0

    Feasibility 0–3 months

    Site shortlist, power and fibre study, written state-policy clarification, customer discovery.

  2. 1

    Commercial validation 3–9 months

    Cloud and AI services on partner capacity; paid pilots; pricing proven.

  3. 2

    Initial facility 6–18 months

    Approvals, grid connection, modular build, commissioning and acceptance tests.

  4. 3

    Customer expansion 12–24 months

    SME and anchor customers on managed AI, backup, security, GPU and private cloud.

  5. 4

    Energy innovation 12–36 months

    Renewable matching, battery optimisation and the seawater-cooling study.

  6. 5

    Scale 24–48 months

    Toward 1 MW and beyond, only after contracted demand and operating performance are proven.

All periods and capacities are planning figures from a pre-feasibility concept paper and are not commitments. Government programmes and state incentives are treated as possible upside only after written approval.

Questions about the initiative

Is Cehpoint building an AI data centre in West Bengal?

A modular first phase of 250–500 kW is being studied in West Bengal, with sites in the Kolkata and New Town region and the Haldia industrial region under comparison. Nothing is built yet; land, power, fibre and approvals are checked first, and the facility grows only against contracted demand.

What is seawater cooling for data centres?

At a coastal site, screened seawater flows through a corrosion-resistant heat exchanger and carries heat away, while a separate sealed loop of treated water cools the servers. Raw seawater never reaches the equipment, and the cooling does not use a city's drinking water. It needs coastal and environmental approval.

Will the data centre run on renewable energy?

The plan is renewable-first: solar and wind through power purchase agreements, batteries for peaks, and scheduling that moves flexible AI jobs to cleaner hours, with the grid kept for reliability. Renewable share and efficiency will be measured and published after commissioning; nothing is claimed in advance.

Is the initiative part of the IndiaAI Mission?

No. The Indian AI Mission Initiative is a private, promoter-led project of Cehpoint, and its name does not indicate any affiliation with, endorsement by or approval from the Government of India or the official IndiaAI Mission. It may apply to public programmes where it is eligible.

How can I invest in AI infrastructure in India with Cehpoint?

Register your interest on the Cehpoint AI home page. Participation starts at ₹10 lakh and is by private, negotiated agreement after due diligence, as permitted by law. This is not an offer or solicitation to sell shares or securities, and returns are not guaranteed.

Partner in the initiative.